Supervise drilling / completion / well intervention operation including CT, slick line, acid wash, well flowing and testing, perforation of more than 30 gas wells at SPD12 & 19 south pars gas field without any LTI/NLTI.
IOEC
Drilling Operation Manager
Fast track startup of SPD14 drilling campaign in two offshore platform at the same time by mobilizing of wo COSL jack up drilling rigs while modify the 26’’ conductor pipes to minimize 32’’ hole section drilling time resulting in achievement of best time record of this section in south pars history. Drilled two short and long learning well at each platform results in placing the bridging documents between IOEC and COSL, Cope with 12 ¼’’ drilling challenges such as salt-water heavy flow, stuck pipes and directional drilling challenges using the lesson-learns/updating and implementing the best drilling programs & procedures and practices, achieving new bit selection scenario which lead to complete the project 120 billion under the budget and
IOEC
Drilling Project Manager
Gathering the professional expert team to prepare new appraisal well proposal outside of south pars gas field while negotiate on CBS/ PMS/ budget of the project with client and finalize the contract with client within 3 months. Conduct fast track tender and place PO/LOI for shortage required material / most qualified drilling service providers while mobilization of offshore drilling jack up rig and start of drilling operation 2 month after signing the contract with client.